4 12 Points Consider Following Relation Schema Work Operotor Item Mode Machine Date 1 Form Q37049066

ineed help with my hw please
4. (12 points) Consider the following relation schema WORK Operotor, Item-Mode, Machine, Date (1) Formulate the following con4. (12 points) Consider the following relation schema WORK Operotor, Item-Mode, Machine, Date (1) Formulate the following constraints on this relation schema as functional deperndencies (o) an operator can work on only one machine on the same day: (b) each Item-Made (eg.skirt,hat) must be made on the same machine. (2) Assume that the following functional dependencies on relatien schem WORK: (Operator, Machine) (Item-Made, Date). Item-Made Machine are given. (Do not consider the F.D.s in the

OR
OR

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.